Western Wall
Northern End
A close up of the limestone bluff near the join of the west & north backdrop
Barry planting the second batch of trees
Barry adding a bit more back ground colour behind the bluff
The first coat of green on the hills makes the hills come alive
![]() |
The hills have got a lot of foliage now
Limestone rock face with good tree coverage on hills
Limestone done and now trees get a touch of black for the trunks
Homestead in the distance with trees in the foreground and background
A close up of the bluff
A close up of the cliff face looking south towards the homestead
Some more trees painted on the western & northern backdrop joint
After a few more trees, the west & north have come together
Compare the two shots' the one above no tree trunks,the one below has
Centre
BJ putting first tree coats on hill tops
BJ putting first tree coats in the foreground
BJ putting the second coat of tree green on in the foreground
BJ working south along the hill face with the second coat of green
BJ heading further south on the hill side with the supervisors cage to the right
Looking good, while the Santa Fe slumber away waiting on the helix bypass
BJ creating limestone outcrops
Limestone outcrops, or is it snow in the distance ?
Limestone outcrops in the foreground
Southern End
BJ's work joins the south and west backdrops with the first coat of trees
Second coat of green brings the trees to life on the south & western backdrop
A close up of BJ painting the third coat of green trees to the cliff face
More green trees to the other cliff
The end result after the gully,trees and cliff face's have been painted in
A closer look at another gully with the dark distant hills
An overall view of hills,gully's and distant rangers
Island
Work in progress, bogging and sanding while Barry paints the north west corner
Bob, and myself sanding back the backdrop
Bob and myself hard at sanding while Jim man's the camera
The backdrop is low on the left side so the boys can see over to the eastern wall from the centre isle
The first coat of sky blue has been applied to the backdrop

Time to check out what BJ and the boys are up to
North East Corner
Barry Putting on the first coat of green for the foreground hills
Barry putting on the green coat of paint which will bring the north east corner to life
The north east corner is complete now except for trees and other foliage
North east corner looking good
Above the Helix
Barry has painted some foreground hills on the south-eastern corner
Barry has continued the foreground hills above the helix top on the southern wall
Barry has started to paint the dark green which is the distant hill colour
( watch that beam Barry )
Barry has worked his way from east to south while the S.P. railroad police watch from there caboose inside the helixSupervisor
The "Supervisor" was present during the work sessionAdmiring the work
Thanks to BJ,Barry,Bob and Jim. cheers to Chris who is resting his dodgy knee.
Thats all folks,till next time.
No comments:
Post a Comment