Sunday 18 November 2012

Mid November

More backdrop stuff and bridge construction commenced


Bottom Level

The linoleum was cleaned and is holding up well.
I gave the linoleum backdrop two coats of white paint.

Western Wall

Now for some clouds ! 
BJ has slap'd on some sky blue paint over the white to give the effect of clouds,



The clouds are making progress.



BJ is now painting in the first outline of some hills.


Now that the first outline of the hills are painted in, ( what colour next )


Here BJ is playing catch up with more hill colour while the sky blue dries a bit.


BJ is applying another coat of brown to blend in to the hillside.


A bit more brown splashed in, that should do it.


BJ has put some touches of trees over the brown, which has brought the hillside to life,


Trees,hills and sky are looking good.


Looking good, not a bush fire anywhere !


Where are the sheep ?

Someone said the sheep are grazing,

OK, I spot them, well done BJ.




Southwestern Corner

The sky is done, and the crease is gone,I said the painter will fix it.


The sky has made it around to the southern corner,now its time for the hillside.


BJ has finished the browns on the hillside and has painted the trees.


I hope to have some small backdrop structures in the future to hide the corner.

Southern Wall Adjacent SW Corner

The sky is on and BJ has made a rough outline of where the hills will go.




A clip of how BJ does it.



The shades of brown and trees are on and BJ is blending the cut alongside the tunnel to match what is behind the stairs.


The end result, well done BJ.

The Bridge

The HEAD BANGER, well this had to be fixed with something solid,
I had to protect my brass steamers & diesels from falling off, if it got a bump,coz I would kill or cry,
not sure what would come first, anyway I got three walthers cornerstone truss bridges,built two as per
instructions then shorten the third and then gutted the beams which would normally hold the rails so it would fit over the timber that carries rails and wires to the points coming from the helix, this had to be done so I can go fishing into tunnels, which are at either ends  if something comes off.
                      ( Murphys Law )    know him well.


Thanks BJ,Jim & Chris.
That's  it till next time.
Ros.

Wednesday 7 November 2012

Early November Progress

This update includes more work on backdrops in a number of areas.

BJ adding detail with Pastels


North East Corner




BJ is drawing the tree trunks on with pastels.



The pastel trees have brought the north east corner to life. 



The colour of the hills and the pastel trees have toned in well.



More pastel trees on the hillside are bringing the plaster work in the foreground to life.



Above the Helix



BJ has added more trees above the helix

Western Wall


BJ adding pastel tree trunks to the western wall.

Foliage added to tree trucks painted in September




BJ added some lichen to the tree trunks.


A side view of the lichen trees.

Video of his pastel techniques

The wizard and his pastels,




Western Wall Lower Level





The linoleum is up, ( thanks to all hands on deck, Bob, Barry & Pam. ) the liquid nails went off quick.


All we need to do now is clean it !  ( Thanks Jim for the helping hand.)

South Western Corner

Industrial building



We want to install some sort of Industrial building that will hopefully detract from the corner view.
I hope the painter can hide the ripple on the curve !

Facade location


The MDF board was pulled off the southern wall by the stairs and replaced with linoleum so we could install building facades at a later date and have better clearances.

Ros cleaning off installation marks




Thanks to BJ,  Jim, Bob, Barry,Chris & Pam.

That's it till next time.