This update includes more work on backdrops in a number of areas.
BJ adding detail with Pastels
North East Corner
BJ is drawing the tree trunks on with pastels.
The pastel trees have brought the north east corner to life.
The colour of the hills and the pastel trees have toned in well.
More pastel trees on the hillside are bringing the plaster work in the foreground to life.
Above the Helix
BJ has added more trees above the helix
Western Wall
BJ adding pastel tree trunks to the western wall.
Foliage added to tree trucks painted in September
BJ added some lichen to the tree trunks.
A side view of the lichen trees.
Video of his pastel techniques
The wizard and his pastels,
Western Wall Lower Level
The linoleum is up, ( thanks to all hands on deck, Bob, Barry & Pam. ) the liquid nails went off quick.
All we need to do now is clean it ! ( Thanks Jim for the helping hand.)
South Western Corner
Industrial building
We want to install some sort of Industrial building that will hopefully detract from the corner view.
I hope the painter can hide the ripple on the curve !
Facade location
The MDF board was pulled off the southern wall by the stairs and replaced with linoleum so we could install building facades at a later date and have better clearances.
Ros cleaning off installation marks
Thanks to BJ, Jim, Bob, Barry,Chris & Pam.
That's it till next time.
That's it till next time.
No comments:
Post a Comment